This series of shots are the latest in a war on rust. They show the extensive
repair of rusted out floors, kick panels, and sides. In addition it shows more
shots of the hidden u-bolt plates, and the repairs of the rear body mounts. They
sag and need to be beefed up.
|
|
|
| Category |
Sub |
Component |
|
Ref # |
|
|
|
|
| OVERALL |
|
|
| Protection Framing |
|
Incomplete |
| Suspension Drivetrain |
|
Complete |
| Steering |
|
Complete |
| Brakes |
|
Complete |
| Electrical Ignition |
|
Incomplete |
| Oxygen |
|
Incomplete |
| Fuel |
|
Complete |
| Flooring |
|
Incomplete |
| Lighting |
|
Complete |
|
|
|
| Framing |
|
|
|
A |
Front Bumper |
|
B |
Rear Bumper |
|
C |
Warn 9500R winch (4.8 hp) |
|
D |
Nerf Bars *Built* |
|
E |
Roll Cage |
|
F |
Rocker Armor |
|
G |
Glove box
*Installed* |
|
H |
Aluminum DP trannie tunnel cover |
|
|
|
| Suspension |
|
Suspension
Drivetrain section completed |
| Drive train |
|
|
|
A |
3/8 Extended shackles *Installed* |
|
B |
Hidden U-Bolt Plates
*Installed* |
|
C |
5/8 Sever duty U-Bolts *Installed* |
|
D |
LockRight Rear Locker
*Installed* |
|
E |
2" Body Lift
*Installed* |
|
F |
Polyurethane Body Bushings
*Installed* |
|
G |
Poly Spring Bushings *Installed* |
|
|
|
| Steering |
|
Steering
section completed |
|
A |
Straight Steering Brace *Installed* |
|
B |
Stainless Steel 1" solid Draglink w/1 ton ends *Installed* |
|
C |
Stainless Steel 1" solid Tie rod w/heim joints *Installed* |
|
D |
Borgeson Steering shaft
conversion *Installed* |
|
|
|
| Brakes |
|
Brakes
section completed |
|
A |
Rear Disk Brake Conversion
W/e-brake capability
*Installed* |
|
B |
Emergency Brake Brackets *Installed* |
|
D |
Stainless steel braided brake lines
*Installed* |
|
|
|
| Electrical |
|
Electrical
Section Completed |
|
A |
Jacobs Pro-Street Ultra Team
*Installed* |
|
B |
Jacobs Anti-Theft Switch
*Installed* |
|
C |
Autolite Spark Plugs
*Installed* |
|
D |
Jacobs Opto-Timer Deluxe *Installed* |
|
E |
Mean Green Battery Isolator setup 130 amp
*Installed* |
|
F |
Mean Green Starter
*Installed* |
|
G |
DC Engineering 130 amp Alt
*Installed* |
|
H |
Optima Yellow Top (2)
*Installed* |
|
I |
New Battery Cables and
connectors
*Installed* |
|
J |
Jacobs Battery Cutoff
switch
*Installed* |
|
K |
Fabricate Battery
Boxes
*Installed* |
|
L |
Pertronics
Ignighter
*Installed* |
|
|
|
| Oxygen |
|
|
|
A |
Snorkel Air Intake system *90% completed* |
|
B |
K&N air filter *Installed* |
|
|
|
| Fuel |
|
Fuel
Section Completed |
|
A |
33Gallon fuel tank w/skid plate*Finished needs installed* |
|
B |
Holly 2bbl F.I. W/oxygen sensor *Installed* |
|
C |
Fuel Injection accessories
*Installed* |
|
D |
In-line
reserve tank for F.I.
*Installed* |
|
E |
Panther Fuel Stabilizer
*Installed* |
|
|
|
| Flooring |
|
|
|
A |
Front Floors
*Installed* |
|
B |
Rear Floor
*Installed* |
|
C |
Mud
Guards *Installed* |
|
D |
Front Body
Mounts
*Installed* |
|
E |
Patching Top Of
Rockers
*Installed* |
|
F |
Patching side walls of Bed and kick panels
*Installed* |
|
G |
Doors and Tailgate seals |
|
|
|
| Lighting |
|
Lighting
section completed |
|
A |
Hella Headlamps 7" round *Installed* |